Permit: TR-ROW-1026-01133
Permit Details
Apply Date:
10/13/2026
Applicant:
Antonio Lopez - National Barricade Company
Description:
Scope of Work • Crosswalk Striping: Striping and refreshing the crosswalks at the intersection of Granada Ave. & Cushing St. to replace the old transverse lines with high-visibility ladder-style markings. • Greenway & Bike Path Integration: Constructing a shared-use path return featuring a 4" solid yellow centerline, bike wayfinding pavement markings, and installing a new "STOP" sign (R1-1, 18"x18") on a new post alongside a new greenway entry sign. • Intersection Safety Improvements: Refreshing the bike path markings with high-visibility layouts, supplemented by a warning sign indicating turning vehicles yielding to bicycles and pedestrians.
Permit Reviews
Permit Number - TR-ROW-1026-01133
Permit Status: Issued
Permit Description: Scope of Work
• Crosswalk Striping: Striping and refreshing the crosswalks at the intersection of Granada Ave. & Cushing St. to replace the old transverse lines with high-visibility ladder-style markings.
• Greenway & Bike Path Integration: Constructing a shared-use path return featuring a 4" solid yellow centerline, bike wayfinding pavement markings, and installing a new "STOP" sign (R1-1, 18"x18") on a new post alongside a new greenway entry sign.
• Intersection Safety Improvements: Refreshing the bike path markings with high-visibility layouts, supplemented by a warning sign indicating turning vehicles yielding to bicycles and pedestrians.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/14/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/23/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1026-01133
Permit Status: Issued
Permit Description: Scope of Work
• Crosswalk Striping: Striping and refreshing the crosswalks at the intersection of Granada Ave. & Cushing St. to replace the old transverse lines with high-visibility ladder-style markings.
• Greenway & Bike Path Integration: Constructing a shared-use path return featuring a 4" solid yellow centerline, bike wayfinding pavement markings, and installing a new "STOP" sign (R1-1, 18"x18") on a new post alongside a new greenway entry sign.
• Intersection Safety Improvements: Refreshing the bike path markings with high-visibility layouts, supplemented by a warning sign indicating turning vehicles yielding to bicycles and pedestrians.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 10/15/2026 | The following extended traffic control set-up times were approved: |
| 10/15/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination |
| 10/15/2026 | An approved SunLink Track Access must be uploaded prior to the start of work; and for night work: An approved TNE must be uploaded prior to the start of work |
| 10/15/2026 | Approved Temporary Noise Exemption required prior to Night work being performed within the City of Tucson Right of Way.. |
| 10/15/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/15/2026 | Rolling Traffic Control Closures Law Enforcement Point Control Required at All crossing of Signalized or Major Intersections Rolling Closure to Require Cone placement for extended Static Work Pre-Warning Signing to include Road Work Ahead, w/Right Lane Closed Ahead on Truck for Stand by Flagman to be used for Side roads for Static Work locations. Rolling shadow traffic control closures not to exceed 2 hrs in a single location, with onsite flaggers for right of way with less than 2 travel lanes in each direction. Closures that exceed 2 hrs will require full traffic control setups based on road configuration. |
| 10/15/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |