Permit: TR-ROW-1026-01104
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
2872 W CALLE MORADO
Address NEW:
2872 W CALLE MORADO
Apply Date:
10/06/2026
Applicant:
Al Coronado
Description:
ROW Permit Info: Side walk will have 2 squares removed; approx 4 ft wide x 8 ft long Barricades will be out Scope of work: Replace 4" ABS sewer line approximately 70 feet from the house to the SDR pipe at the curb lines, new line will be 4" ABS pipe. Excavate 3 feet deep at the house approximately 5 feet deep at the curb.
Permit Reviews
Permit Number - TR-ROW-1026-01104
Permit Status: Inspections
Permit Description: ROW Permit Info:
Side walk will have 2 squares removed; approx 4 ft wide x 8 ft long
Barricades will be out
Scope of work: Replace 4" ABS sewer line approximately 70 feet from the house to the SDR pipe at the curb lines, new line will be 4" ABS pipe. Excavate 3 feet deep at the house approximately 5 feet deep at the curb.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/06/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/06/2026 | REQUIRES RESUBMIT |
| 10/06/2026 | RIGHT-OF-WAY REVIEW v.2 | 10/08/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1026-01104
Permit Status: Inspections
Permit Description: ROW Permit Info:
Side walk will have 2 squares removed; approx 4 ft wide x 8 ft long
Barricades will be out
Scope of work: Replace 4" ABS sewer line approximately 70 feet from the house to the SDR pipe at the curb lines, new line will be 4" ABS pipe. Excavate 3 feet deep at the house approximately 5 feet deep at the curb.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 10/06/2026 | Local Street Pavement Moratorium |
| 10/06/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/06/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 10/06/2026 | Traffic Control set-up approved between 7AM - 5PM |