Permit: TR-ROW-1026-01088
Permit Details
Status:
Approved
Type:
Right-of-Way (ROW)
Address:
640 N SANTA RITA AV
Address NEW:
640 N SANTA RITA AV
Apply Date:
10/02/2026
Applicant:
Robert Brown
Description:
Will need to hard close E 4th St. From N Santa Rita Ave, about 375'ft east. Will be placing a crane in the ROW. For removal and later reinstallation of damaged pump. Traffic will be detour south, to E 6th Ave. Additionally Flagger will be onsite to assist with pedestrian crossing. RCB*-* PERMIT ONLY FOR WORK IMPACTING CITY OF TUCSON RIGHT OF WAY
Permit Reviews
Permit Number - TR-ROW-1026-01088
Permit Status: Approved
Permit Description: Will need to hard close E 4th St. From N Santa Rita Ave, about 375'ft east. Will be placing a crane in the ROW. For removal and later reinstallation of damaged pump. Traffic will be detour south, to E 6th Ave. Additionally Flagger will be onsite to assist with pedestrian crossing.
RCB*-*
PERMIT ONLY FOR WORK IMPACTING CITY OF TUCSON RIGHT OF WAY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/05/2026 | RIGHT-OF-WAY REVIEW v.1 | 11/02/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1026-01088
Permit Status: Approved
Permit Description: Will need to hard close E 4th St. From N Santa Rita Ave, about 375'ft east. Will be placing a crane in the ROW. For removal and later reinstallation of damaged pump. Traffic will be detour south, to E 6th Ave. Additionally Flagger will be onsite to assist with pedestrian crossing.
RCB*-*
PERMIT ONLY FOR WORK IMPACTING CITY OF TUCSON RIGHT OF WAY
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 10/08/2026 | City of Tucson Right of Way Only |
| 10/08/2026 | Multiple jurisdictions |
| 10/08/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/08/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 10/08/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/02/2026 | Approved for the sign placement on 6th and Park only. This permit is NOT an approval for the crane placement or work taking place on UofA property. |