Permit Details

Status:
Approved
Type:
Right-of-Way (ROW)
Address NEW:
640 N SANTA RITA AV
Apply Date:
10/02/2026
Applicant:
Robert Brown
Description:
Will need to hard close E 4th St. From N Santa Rita Ave, about 375'ft east. Will be placing a crane in the ROW. For removal and later reinstallation of damaged pump. Traffic will be detour south, to E 6th Ave. Additionally Flagger will be onsite to assist with pedestrian crossing. RCB*-* PERMIT ONLY FOR WORK IMPACTING CITY OF TUCSON RIGHT OF WAY

Permit Reviews

Permit Number - TR-ROW-1026-01088
Permit Status: Approved
Permit Description: Will need to hard close E 4th St. From N Santa Rita Ave, about 375'ft east. Will be placing a crane in the ROW. For removal and later reinstallation of damaged pump. Traffic will be detour south, to E 6th Ave. Additionally Flagger will be onsite to assist with pedestrian crossing. RCB*-* PERMIT ONLY FOR WORK IMPACTING CITY OF TUCSON RIGHT OF WAY
Start Date Submittal Complete Date Status  
10/05/2026 RIGHT-OF-WAY REVIEW v.1 11/02/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1026-01088
Permit Status: Approved
Permit Description: Will need to hard close E 4th St. From N Santa Rita Ave, about 375'ft east. Will be placing a crane in the ROW. For removal and later reinstallation of damaged pump. Traffic will be detour south, to E 6th Ave. Additionally Flagger will be onsite to assist with pedestrian crossing. RCB*-* PERMIT ONLY FOR WORK IMPACTING CITY OF TUCSON RIGHT OF WAY
Total Outstanding Activity Conditions - 6
Date Name
10/08/2026 City of Tucson Right of Way Only
10/08/2026 Multiple jurisdictions
10/08/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
10/08/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
10/08/2026 Traffic control set-up approved between 9AM - 3:30PM
11/02/2026 Approved for the sign placement on 6th and Park only. This permit is NOT an approval for the crane placement or work taking place on UofA property.