Permit: TR-ROW-1025-01294
Permit Details
Apply Date:
N/A
Applicant:
CAITLIN RIPLEY - SOUTHWEST BARRICADES
Description:
N/A
Permit Reviews
Permit Number - TR-ROW-1025-01294
Permit Status:
Permit Description:
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/20/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/21/2025 | REQUIRES RESUBMIT |
| 11/14/2025 | RIGHT-OF-WAY REVIEW v.3 | 11/14/2025 | APPROVED |
| 06/22/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | 06/29/2026 | REQUIRES RESUBMIT |
| 11/04/2025 | RIGHT-OF-WAY REVIEW v.2 | 11/05/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-1025-01294
Permit Status:
Permit Description:
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 11/04/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/14/2025 | The following extended traffic control set-up times were approved: 24 hrs. |
| 11/14/2025 | Additional ROW permitting required for hardscape installation. |
| 11/14/2025 | Bike Lane Access and Accommodation Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 11/14/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 11/14/2025 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 11/14/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 11/14/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Outstanding Inspections
Permit Status:
Permit Number: TR-ROW-1025-01294
Permite Description:
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| TRSP - ROW - Final | N/A | Requested |
Completed Inspections
Permit Status:
Permit Number: TR-ROW-1025-01294
Permit Description:
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Contractor is following an approved traffic control plan | |
| 11/20/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Mike Bravin met on site with both contractors. |