Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
422 S SWAN RD
Address NEW:
422 S SWAN RD
Apply Date:
10/08/2025
Applicant:
ANGEL MORALES
Description:
24hr closure for cell tower work 11-17-25 thru 11-19-25.*** Revision: 10/22/2025 Modifying the permit start and end dates for consistency with the contractor’s planned work period. Start date of October 24, 2025 with an expiration date of 11/23/2025.

Permit Reviews

Permit Number - TR-ROW-1025-01259
Permit Status: Inspections
Permit Description: 24hr closure for cell tower work 11-17-25 thru 11-19-25.*** Revision: 10/22/2025 Modifying the permit start and end dates for consistency with the contractor’s planned work period. Start date of October 24, 2025 with an expiration date of 11/23/2025.
Start Date Submittal Complete Date Status  
10/09/2025 RIGHT-OF-WAY REVIEW v.1 10/14/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1025-01259
Permit Status: Inspections
Permit Description: 24hr closure for cell tower work 11-17-25 thru 11-19-25.*** Revision: 10/22/2025 Modifying the permit start and end dates for consistency with the contractor’s planned work period. Start date of October 24, 2025 with an expiration date of 11/23/2025.
Total Outstanding Activity Conditions - 7
Date Name
10/13/2025 BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
10/13/2025 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions
10/13/2025 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
10/13/2025 Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
10/13/2025 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be effect from NOV 25TH to January 3rd. Due to increase traffic volume on many of the city roads, its necessary to restrict lane closures on certain roads during the Gem Show.
10/13/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
10/21/2025 The following extended traffic control set-up times were approved for 24 Hours

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-ROW-1025-01259
Permite Description: 24hr closure for cell tower work 11-17-25 thru 11-19-25.*** Revision: 10/22/2025 Modifying the permit start and end dates for consistency with the contractor’s planned work period. Start date of October 24, 2025 with an expiration date of 11/23/2025.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/17/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-ROW-1025-01259
Permit Description: 24hr closure for cell tower work 11-17-25 thru 11-19-25.*** Revision: 10/22/2025 Modifying the permit start and end dates for consistency with the contractor’s planned work period. Start date of October 24, 2025 with an expiration date of 11/23/2025.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/22/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/17/2025 TRSP - ROW - Barricade - Setup/Routine Passed
11/17/2025 TRSP - ROW - AERIAL INSTALLATION Passed

Documents

File Name Document Type  
422 S SWAN RD SITE_V1.PDF DOCUMENTS VIEW
422 S SWAN RD TCP1_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW