Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-1025-01231
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
1230 S CHERRYBELL SV
Address NEW:
1230 S CHERRYBELL SV
Apply Date:
10/03/2025
Applicant:
Brittany Bechtold
Description:
Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
Permit Reviews
Permit Number - TR-ROW-1025-01231
Permit Status: Inspections
Permit Description: Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/03/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1025-01231
Permit Status: Inspections
Permit Description: Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 10/06/2025 | |
| 10/06/2025 | |
| 10/06/2025 | |
| 10/06/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/06/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-ROW-1025-01231
Permite Description: Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Scheduled |
Scheduled Inspections
Scheduled Inspections - TR-ROW-1025-01231
Status: Inspections
Description: Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 12/16/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.