Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
3048 E BROADWAY BL
Apply Date:
10/03/2025
Applicant:
BORDER TRAFFIC SAFETY BEN LOZANO
Description:
Place 5280 ft of aerial fiber on existing plant on power poles for First Digital Telecom

Permit Reviews

Permit Number - TR-ROW-1025-01228
Permit Status: Complete
Permit Description: Place 5280 ft of aerial fiber on existing plant on power poles for First Digital Telecom
Start Date Submittal Complete Date Status  
10/03/2025 RIGHT-OF-WAY REVIEW v.1 10/06/2025 REQUIRES RESUBMIT Review Details
10/08/2025 RIGHT-OF-WAY REVIEW v.2 10/09/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1025-01228
Permit Status: Complete
Permit Description: Place 5280 ft of aerial fiber on existing plant on power poles for First Digital Telecom
Total Outstanding Activity Conditions - 6
Date Name
10/03/2025 BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
10/03/2025 Traffic control set-up approved between 9AM - 3:30PM
10/03/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
10/09/2025 Pedestrian Access & Sidewalk
10/09/2025 Pre-Activity Meeting with Inspections
10/09/2025 Rolling Traffic Control Closures

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1025-01228
Permit Description: Place 5280 ft of aerial fiber on existing plant on power poles for First Digital Telecom
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/16/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/14/2025 TRSP - ROW - Final Passed
11/14/2025 TRSP - ROW - AERIAL INSTALLATION Passed