Permit: TR-ROW-1025-01222
Permit Details
Apply Date:
10/01/2025
Applicant:
Gabriel Hernandez
Description:
GEOTECHNICAL DRILLING WITHIN THE SAN FERNANDO ROADWAYS. BORINGS WILL BE FOR SOIL SAMPLING AND WILL BE DRILLED FROM 10 TO 20 FEET IN DEPTH. BORINGS WILL BE 8 TO 10 INCHES IN DIAMETER. AND DRILLED WITH A TUCK-MOUNTED DRILL RIG.
Permit Reviews
Permit Number - TR-ROW-1025-01222
Permit Status: Complete
Permit Description: GEOTECHNICAL DRILLING WITHIN THE SAN FERNANDO ROADWAYS. BORINGS WILL BE FOR SOIL SAMPLING AND WILL BE DRILLED FROM 10 TO 20 FEET IN DEPTH. BORINGS WILL BE 8 TO 10 INCHES IN DIAMETER. AND DRILLED WITH A TUCK-MOUNTED DRILL RIG.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/01/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/08/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1025-01222
Permit Status: Complete
Permit Description: GEOTECHNICAL DRILLING WITHIN THE SAN FERNANDO ROADWAYS. BORINGS WILL BE FOR SOIL SAMPLING AND WILL BE DRILLED FROM 10 TO 20 FEET IN DEPTH. BORINGS WILL BE 8 TO 10 INCHES IN DIAMETER. AND DRILLED WITH A TUCK-MOUNTED DRILL RIG.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 10/02/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 10/02/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1025-01222
Permit Description: GEOTECHNICAL DRILLING WITHIN THE SAN FERNANDO ROADWAYS. BORINGS WILL BE FOR SOIL SAMPLING AND WILL BE DRILLED FROM 10 TO 20 FEET IN DEPTH. BORINGS WILL BE 8 TO 10 INCHES IN DIAMETER. AND DRILLED WITH A TUCK-MOUNTED DRILL RIG.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/10/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/10/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/10/2025 | TRSP - ROW - Final | Passed |