Permit: TR-ROW-1024-01279
Permit Details
Apply Date:
10/31/2024
Applicant:
Erica Goldston
Description:
Hunter will be doing some Bench Rehabs, Install Terminal MH,, 8" Point Repair to remove obstruction, Remove and Replace Sidewalk for Point Repair. We will have Vactor Trucks on Standby onsite. These will be 24hr TC set up Message boards will be out before work starts. This is associated with the Prop 101 Rehab Package 5 Project.
Permit Reviews
Permit Number - TR-ROW-1024-01279
Permit Status: Complete
Permit Description: Hunter will be doing some Bench Rehabs, Install Terminal MH,, 8" Point Repair to remove obstruction, Remove and Replace Sidewalk for Point Repair. We will have Vactor Trucks on Standby onsite. These will be 24hr TC set up Message boards will be out before work starts.
This is associated with the Prop 101 Rehab Package 5 Project.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/06/2024 | RIGHT-OF-WAY REVIEW v.1 | 11/06/2024 | APPROVED |
| 10/31/2024 | RIGHT-OF-WAY REVIEW v.1 | 11/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1024-01279
Permit Status: Complete
Permit Description: Hunter will be doing some Bench Rehabs, Install Terminal MH,, 8" Point Repair to remove obstruction, Remove and Replace Sidewalk for Point Repair. We will have Vactor Trucks on Standby onsite. These will be 24hr TC set up Message boards will be out before work starts.
This is associated with the Prop 101 Rehab Package 5 Project.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/01/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1024-01279
Permit Description: Hunter will be doing some Bench Rehabs, Install Terminal MH,, 8" Point Repair to remove obstruction, Remove and Replace Sidewalk for Point Repair. We will have Vactor Trucks on Standby onsite. These will be 24hr TC set up Message boards will be out before work starts.
This is associated with the Prop 101 Rehab Package 5 Project.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2025 | TRSP - ROW - Final | Passed |