Permit: TR-ROW-1024-01252
Permit Details
Apply Date:
10/25/2024
Applicant:
Kendall Murie
Description:
Mountain View - Halcyon. Funded by City of Tucson Water mini grants program. Collaboration with neighborhood community body to install 8 back of curb rainwater basins. In Total: ~138 linear feet of Basin length.
Permit Reviews
Permit Number - TR-ROW-1024-01252
Permit Status: Complete
Permit Description: Mountain View - Halcyon. Funded by City of Tucson Water mini grants program. Collaboration with neighborhood community body to install 8 back of curb rainwater basins. In Total: ~138 linear feet of Basin length.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/25/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/29/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1024-01252
Permit Status: Complete
Permit Description: Mountain View - Halcyon. Funded by City of Tucson Water mini grants program. Collaboration with neighborhood community body to install 8 back of curb rainwater basins. In Total: ~138 linear feet of Basin length.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 10/25/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 10/25/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 12/11/2024 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1024-01252
Permit Description: Mountain View - Halcyon. Funded by City of Tucson Water mini grants program. Collaboration with neighborhood community body to install 8 back of curb rainwater basins. In Total: ~138 linear feet of Basin length.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/10/2025 | TRSP - ROW - Final | Passed | ||
| 01/06/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed |