Permit: TR-ROW-1024-01248
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3085 S CAMPBELL AV
Address NEW:
3085 S CAMPBELL AV
Apply Date:
10/24/2024
Applicant:
Dan Padilla
Description:
ROW Permit for air-vacuum excavation of 3 utility potholes one in 10" core in pavement and two approximately 12"x12" in size off road, for the design phase of City of Tucson El Paso and Southwestern Greenway at 36th St Kino Parkway to Ajo Detention Basin Project
Permit Reviews
Permit Number - TR-ROW-1024-01248
Permit Status: Complete
Permit Description: ROW Permit for air-vacuum excavation of 3 utility potholes one in 10" core in pavement and two approximately 12"x12" in size off road, for the design phase of City of Tucson El Paso and Southwestern Greenway at 36th St Kino Parkway to Ajo Detention Basin Project
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/25/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/25/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1024-01248
Permit Status: Complete
Permit Description: ROW Permit for air-vacuum excavation of 3 utility potholes one in 10" core in pavement and two approximately 12"x12" in size off road, for the design phase of City of Tucson El Paso and Southwestern Greenway at 36th St Kino Parkway to Ajo Detention Basin Project
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 10/25/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/25/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1024-01248
Permit Description: ROW Permit for air-vacuum excavation of 3 utility potholes one in 10" core in pavement and two approximately 12"x12" in size off road, for the design phase of City of Tucson El Paso and Southwestern Greenway at 36th St Kino Parkway to Ajo Detention Basin Project
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/31/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/31/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 12/31/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/31/2024 | TRSP - ROW - Final | Passed |