Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-1024-01218
Permit Details
Apply Date:
10/16/2024
Applicant:
ANGEL MORALES
Description:
On the southwest side remove and replace 20’ of asphalt path and replace with 30’ of new standard concrete sidewalk. On the southeast side remove 30’ of asphalt path and replace with 30’ of new asphalt.***
Permit Reviews
Permit Number - TR-ROW-1024-01218
Permit Status: Complete
Permit Description: On the southwest side remove and replace 20’ of asphalt path and replace with 30’ of new standard concrete sidewalk. On the southeast side remove 30’ of asphalt path and replace with 30’ of new asphalt.***
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/16/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1024-01218
Permit Status: Complete
Permit Description: On the southwest side remove and replace 20’ of asphalt path and replace with 30’ of new standard concrete sidewalk. On the southeast side remove 30’ of asphalt path and replace with 30’ of new asphalt.***
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
10/16/2024 | PRE-CON/PAVEMENT/SIDEWALK |
10/16/2024 | SIDEWALK - STANDARD DETAIL 200 |
10/16/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1024-01218
Permit Description: On the southwest side remove and replace 20’ of asphalt path and replace with 30’ of new standard concrete sidewalk. On the southeast side remove 30’ of asphalt path and replace with 30’ of new asphalt.***
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre-con meeting held 10/18, detailed asphalt and sidewalk plans | |
11/21/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | asphalt path and apron inspected and approved on 10/25 | |
11/21/2024 | TRSP - ROW - Final | Passed | sidewalk and asphalt sections complete, site closed | |
11/21/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Sidewalk pour checked and accepted on 10/22 |