Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
10/14/2024
Applicant:
Dan Padilla
Description:
Air-Vacuum Excavation of 46 Utility Potholes within 10" cores for the design phase of Tucson Water Mission Manor Main Replacement Phases 2A -2D Project.

Permit Reviews

Permit Number - TR-ROW-1024-01210
Permit Status: Complete
Permit Description: Air-Vacuum Excavation of 46 Utility Potholes within 10" cores for the design phase of Tucson Water Mission Manor Main Replacement Phases 2A -2D Project.
Start Date Submittal Complete Date Status  
10/15/2024 RIGHT-OF-WAY REVIEW v.1 10/16/2024 REQUIRES RESUBMIT Review Details
10/18/2024 RIGHT-OF-WAY REVIEW v.2 10/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1024-01210
Permit Status: Complete
Permit Description: Air-Vacuum Excavation of 46 Utility Potholes within 10" cores for the design phase of Tucson Water Mission Manor Main Replacement Phases 2A -2D Project.
Total Outstanding Activity Conditions - 4
Date Name
10/15/2024 PRE-CON/PAVEMENT/SIDEWALK
10/15/2024 Traffic Control set-up approved between 7AM - 5PM
10/15/2024 Traffic control set-up approved between 9AM - 3:30PM
10/18/2024 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1024-01210
Permit Description: Air-Vacuum Excavation of 46 Utility Potholes within 10" cores for the design phase of Tucson Water Mission Manor Main Replacement Phases 2A -2D Project.
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/08/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
01/28/2025 TRSP - ROW - Barricade - Setup/Routine Passed
01/28/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
01/28/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
COMBINED TCPS_V1.PDF DOCUMENTS VIEW
DESIGN PLAN - MISSION MANOR PHASE 2A-2D COMBINED POTHOLE PLANS V1_V1.PDF DOCUMENTS VIEW
SITE PLAN MISSION MANOR PHASE 2A-2D POTHOLES_V2.PDF DOCUMENTS VIEW