Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW)
Address:
1 E BROADWAY BL
Apply Date:
10/03/2024
Applicant:
Wylwyn Reyes
Description:
Each of those locations has a utility box within the ROW (I chose the addresses as close to the utility boxes as possible). The Arts Foundation is working with DTM and Rio Nuevo to wrap these in artist designed vinyl. We are looking to secure permits to allow for the installation at each location. Art work project work to Occur in Multiple locations (corners) within Downtown area. Previous permit TR-ROW-0324-00349

Permit Reviews

Permit Number - TR-ROW-1024-01172
Permit Status: Fees due
Permit Description: Each of those locations has a utility box within the ROW (I chose the addresses as close to the utility boxes as possible). The Arts Foundation is working with DTM and Rio Nuevo to wrap these in artist designed vinyl. We are looking to secure permits to allow for the installation at each location. Art work project work to Occur in Multiple locations (corners) within Downtown area. Previous permit TR-ROW-0324-00349
Start Date Submittal Complete Date Status  
10/04/2024 RIGHT-OF-WAY REVIEW v.1 10/29/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1024-01172
Permit Status: Fees due
Permit Description: Each of those locations has a utility box within the ROW (I chose the addresses as close to the utility boxes as possible). The Arts Foundation is working with DTM and Rio Nuevo to wrap these in artist designed vinyl. We are looking to secure permits to allow for the installation at each location. Art work project work to Occur in Multiple locations (corners) within Downtown area. Previous permit TR-ROW-0324-00349
Total Outstanding Activity Conditions - 2
Date Name
10/04/2024 NO LANES OF TRAFFIC ON CONGRESS AND BROADWAY WILL BE AFFECTED.
10/04/2024 Traffic control set-up approved between 9AM - 3:30PM