Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
413 S 3RD AV
Address NEW:
413 S 3RD AV
Apply Date:
10/13/2023
Applicant:
Dennis Caldwell
Description:
• Remove and replace the existing asphalt, grade will be affected also. • Install a new concrete sidewalk across the street. • Include DP plan page #3

Permit Reviews

Permit Number - TR-ROW-1023-01256
Permit Status: Complete
Permit Description: • Remove and replace the existing asphalt, grade will be affected also. • Install a new concrete sidewalk across the street. • Include DP plan page #3
Start Date Submittal Complete Date Status  
10/13/2023 RIGHT-OF-WAY REVIEW v.1 10/18/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1023-01256
Permit Status: Complete
Permit Description: • Remove and replace the existing asphalt, grade will be affected also. • Install a new concrete sidewalk across the street. • Include DP plan page #3
Total Outstanding Activity Conditions - 3
Date Name
10/13/2023 The following extended traffic control set-up times were approved: Any WORK between 8pm & 6 am will require a TNE to be acquired
10/13/2023 Traffic Control set-up approved between 7AM - 5PM
10/13/2023 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1023-01256
Permit Description: • Remove and replace the existing asphalt, grade will be affected also. • Install a new concrete sidewalk across the street. • Include DP plan page #3
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/20/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
03/13/2025 TRSP - ROW - Final/Close-Out Passed