Permit: TR-ROW-1023-01254
Permit Details
Apply Date:
10/13/2023
Applicant:
Erica Goldston
Description:
Sewer MH Rehabilitation and CIPP Lining
Permit Reviews
Permit Number - TR-ROW-1023-01254
Permit Status: Complete
Permit Description: Sewer MH Rehabilitation and CIPP Lining
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/13/2023 | RIGHT-OF-WAY REVIEW v.1 | 10/16/2023 | REQUIRES RESUBMIT |
| 10/16/2023 | RIGHT-OF-WAY REVIEW v.2 | 10/16/2023 | REQUIRES RESUBMIT |
| 10/17/2023 | RIGHT-OF-WAY REVIEW v.3 | 10/18/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1023-01254
Permit Status: Complete
Permit Description: Sewer MH Rehabilitation and CIPP Lining
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 10/18/2023 | Traffic Control set-up approved between 7AM - 5PM |
| 10/18/2023 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 10/18/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1023-01254
Permit Description: Sewer MH Rehabilitation and CIPP Lining
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/22/2024 | TRSP - ROW - Recurring | Passed | ||
| 06/04/2025 | TRSP - ROW - Notice of Completion | Passed |