Permit: TR-ROW-1023-01248
Permit Details
Apply Date:
10/12/2023
Applicant:
Description:
MANHOLE RECONSTRUCTION on Eastside of 1st Ave entry to Rillito Regional Park. ON MH ADDRESS 4580 N 1ST AVE (1708-06) ON THE SHOULDER EAST SIDE OF 1ST AVE PEDESTRIAN TRAFFIC WILL NOT BE AFFECTED.
Permit Reviews
Permit Number - TR-ROW-1023-01248
Permit Status: Complete
Permit Description: MANHOLE RECONSTRUCTION on Eastside of 1st Ave entry to Rillito Regional Park.
ON MH ADDRESS 4580 N 1ST AVE (1708-06) ON THE SHOULDER EAST SIDE OF 1ST AVE PEDESTRIAN TRAFFIC WILL NOT BE AFFECTED.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/25/2023 | RIGHT-OF-WAY REVIEW v.2 | 12/04/2023 | APPROVED |
10/13/2023 | RIGHT-OF-WAY REVIEW v.1 | 10/16/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-1023-01248
Permit Status: Complete
Permit Description: MANHOLE RECONSTRUCTION on Eastside of 1st Ave entry to Rillito Regional Park.
ON MH ADDRESS 4580 N 1ST AVE (1708-06) ON THE SHOULDER EAST SIDE OF 1ST AVE PEDESTRIAN TRAFFIC WILL NOT BE AFFECTED.
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
10/13/2023 | Traffic control set-up approved between 9AM - 3:30PM |
12/22/2023 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
12/22/2023 | Permit Start date has been modified due to holiday restriction beginning November 26, 2020 – January 3, 2021 |
12/22/2023 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-1023-01248
Permite Description: MANHOLE RECONSTRUCTION on Eastside of 1st Ave entry to Rillito Regional Park.
ON MH ADDRESS 4580 N 1ST AVE (1708-06) ON THE SHOULDER EAST SIDE OF 1ST AVE PEDESTRIAN TRAFFIC WILL NOT BE AFFECTED.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/04/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1023-01248
Permit Description: MANHOLE RECONSTRUCTION on Eastside of 1st Ave entry to Rillito Regional Park.
ON MH ADDRESS 4580 N 1ST AVE (1708-06) ON THE SHOULDER EAST SIDE OF 1ST AVE PEDESTRIAN TRAFFIC WILL NOT BE AFFECTED.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/04/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
07/01/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
07/01/2024 | TRSP - ROW - Recurring | Passed |