Permit: TR-ROW-1023-01245
Permit Details
Apply Date:
10/11/2023
Applicant:
ANGEL MORALES
Description:
Barricade setup for related PIA Blackhawk Ranch Phase 1. Lane shift required for installing new right turn lane and curb. 24hr. Clear Contracting - Steve Hoffman
Permit Reviews
Permit Number - TR-ROW-1023-01245
Permit Status: Complete
Permit Description: Barricade setup for related PIA Blackhawk Ranch Phase 1. Lane shift required for installing new right turn lane and curb. 24hr. Clear Contracting - Steve Hoffman
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/11/2023 | RIGHT-OF-WAY REVIEW v.1 | 10/12/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-1023-01245
Permit Status: Complete
Permit Description: Barricade setup for related PIA Blackhawk Ranch Phase 1. Lane shift required for installing new right turn lane and curb. 24hr. Clear Contracting - Steve Hoffman
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
10/12/2023 | The following extended traffic control set-up times were approved: 24hrs. |
10/12/2023 | Other Activities in the Area, Will need to Coordinate Traffic Control setup with Existing setups |
10/12/2023 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
10/12/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1023-01245
Permit Description: Barricade setup for related PIA Blackhawk Ranch Phase 1. Lane shift required for installing new right turn lane and curb. 24hr. Clear Contracting - Steve Hoffman
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/07/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | site completed with pia | |
08/07/2024 | TRSP - ROW - Final/Close-Out | Passed |