Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
475 E ELVADO RD
Address NEW:
475 E ELVADO RD
Apply Date:
10/10/2023
Applicant:
Janice HUGHES
Description:
4 geotechnical borings in the roadway (EB and WB Lanes) of El Vado Rd. Borings will extend to a depth of 15' below grade and will be roughly 8" in diameter ATTN: Jim Degrood (City Coordinator for the project) James.DeGrood@tucsonaz.gov

Permit Reviews

Permit Number - TR-ROW-1023-01240
Permit Status: Complete
Permit Description: 4 geotechnical borings in the roadway (EB and WB Lanes) of El Vado Rd. Borings will extend to a depth of 15' below grade and will be roughly 8" in diameter ATTN: Jim Degrood (City Coordinator for the project) James.DeGrood@tucsonaz.gov
Start Date Submittal Complete Date Status  
10/11/2023 RIGHT-OF-WAY REVIEW v.1 10/13/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1023-01240
Permit Status: Complete
Permit Description: 4 geotechnical borings in the roadway (EB and WB Lanes) of El Vado Rd. Borings will extend to a depth of 15' below grade and will be roughly 8" in diameter ATTN: Jim Degrood (City Coordinator for the project) James.DeGrood@tucsonaz.gov
Total Outstanding Activity Conditions - 2
Date Name
10/11/2023 Traffic Control set-up approved between 7AM - 5PM
10/11/2023 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1023-01240
Permit Description: 4 geotechnical borings in the roadway (EB and WB Lanes) of El Vado Rd. Borings will extend to a depth of 15' below grade and will be roughly 8" in diameter ATTN: Jim Degrood (City Coordinator for the project) James.DeGrood@tucsonaz.gov
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/30/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/24/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
EL VADO BORING MAP_V1.PDF DOCUMENTS VIEW
EL VADO ROAD STORM SEWER PROJECT COOPERATIVE PARTNERSHIP TR ROW 1023 01240_V1.PDF DOCUMENTS VIEW
NINYO918_V1.PDF DOCUMENTS VIEW