Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-1023-01220
Permit Details
Apply Date:
10/04/2023
Applicant:
Christian Celaya
Description:
The contractor will be trenching on the shoulder approx. 15’ to tap into the existing #7 pull box to install electrical conduit for a historic neon sign for Roger Kestler for the City of Tucson. Walkways for pedestrians will be available.
Permit Reviews
Permit Number - TR-ROW-1023-01220
Permit Status: Complete
Permit Description: The contractor will be trenching on the shoulder approx. 15’ to tap into the existing #7 pull box to install electrical conduit for a historic neon sign for Roger Kestler for the City of Tucson. Walkways for pedestrians will be available.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/05/2023 | RIGHT-OF-WAY REVIEW v.1 | 10/06/2023 | APPROVED |
Conditions
Permit Number - TR-ROW-1023-01220
Permit Status: Complete
Permit Description: The contractor will be trenching on the shoulder approx. 15’ to tap into the existing #7 pull box to install electrical conduit for a historic neon sign for Roger Kestler for the City of Tucson. Walkways for pedestrians will be available.
| Date | Description | Comments |
|---|---|---|
| 10/05/2023 | Traffic control set-up approved between 9AM - 3:30PM | |
| 10/05/2023 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1023-01220
Permit Description: The contractor will be trenching on the shoulder approx. 15’ to tap into the existing #7 pull box to install electrical conduit for a historic neon sign for Roger Kestler for the City of Tucson. Walkways for pedestrians will be available.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Putting up a new neon sign all work will be done in dirt and some existing conduits | |
| 11/16/2023 | TRSP - ROW - Final/Close-Out | Passed |