Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-1022-00005
Permit Details
Apply Date:
10/27/2022
Applicant:
ANGEL MORALES
Description:
Bridge Deck Repairs - Removing the existing concrete slab and repouring new. Each lane has a 20x30 concrete patch that will be removed and replaced. The concrete right now is higher than the existing road.
Permit Reviews
Permit Number - TR-ROW-1022-00005
Permit Status: Complete
Permit Description: Bridge Deck Repairs - Removing the existing concrete slab and repouring new. Each lane has a 20x30 concrete patch that will be removed and replaced. The concrete right now is higher than the existing road.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/04/2022 | RIGHT-OF-WAY REVIEW v.1 | 11/04/2022 | APPROVED |
Conditions
Permit Number - TR-ROW-1022-00005
Permit Status: Complete
Permit Description: Bridge Deck Repairs - Removing the existing concrete slab and repouring new. Each lane has a 20x30 concrete patch that will be removed and replaced. The concrete right now is higher than the existing road.
| Date | Description | Comments |
|---|---|---|
| 11/07/2022 | The following extended traffic control set-up times were approved: | |
| 11/07/2022 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-1022-00005
Permite Description: Bridge Deck Repairs - Removing the existing concrete slab and repouring new. Each lane has a 20x30 concrete patch that will be removed and replaced. The concrete right now is higher than the existing road.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2022 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-1022-00005
Permit Description: Bridge Deck Repairs - Removing the existing concrete slab and repouring new. Each lane has a 20x30 concrete patch that will be removed and replaced. The concrete right now is higher than the existing road.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2023 | TRSP - ROW - SITE INSPECTION | Passed |