Permit: TR-ROW-0926-01059
Permit Details
Apply Date:
09/29/2026
Applicant:
Garcia David
Description:
Open and survey sewer manholes depths. Work will happen early Saturday morning and will be a rolling traffic control set-up. Just long enough to open a manhole and measure the distance from the rim elevation to the pipe invert(s).
Permit Reviews
Permit Number - TR-ROW-0926-01059
Permit Status: Inspections
Permit Description: Open and survey sewer manholes depths. Work will happen early Saturday morning and will be a rolling traffic control set-up. Just long enough to open a manhole and measure the distance from the rim elevation to the pipe invert(s).
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/29/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/21/2026 | REQUIRES RESUBMIT |
| 10/25/2026 | RIGHT-OF-WAY REVIEW v.2 | 10/26/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0926-01059
Permit Status: Inspections
Permit Description: Open and survey sewer manholes depths. Work will happen early Saturday morning and will be a rolling traffic control set-up. Just long enough to open a manhole and measure the distance from the rim elevation to the pipe invert(s).
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 09/30/2026 | Bus Stop/Route |
| 09/30/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/30/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 09/30/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/30/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 10/26/2026 | Shadow truck operations shall be conducted in accordance with the approved TCP and applicable MUTCD requirements. Maintain safe traffic flow and provide appropriate protection for workers and the traveling public, including a truck-mounted attenuator (TMA) where required. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0926-01059
Permit Description: Open and survey sewer manholes depths. Work will happen early Saturday morning and will be a rolling traffic control set-up. Just long enough to open a manhole and measure the distance from the rim elevation to the pipe invert(s).
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre-Warners will go out Monday or Tuesday of next week. They will be working on Saturday as long as they have the approval of their engineers to not do intersections or if they do they have to have the proper traffic control extra. | |
| 11/06/2026 | Required: Start Work Notice - Notify your DTM Inspector of your work start date. Notification only; you will be contacted if a Pre-Activity Meeting is needed. | Passed | yes sewer access to get elevations for future first Avenue project |