Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW)
Address:
8151 E KENYON DR
Address NEW:
8151 E KENYON DR
Apply Date:
09/29/2026
Applicant:
ALICIA OROZCO
Description:
1 40YRD ROLL OFF TO BE DELIVERED ON 10/14 AND REMOVED ON 10/29 WILL BE PLACED IN FRONT OF HOUSE OFF STREET

Permit Reviews

Permit Number - TR-ROW-0926-01056
Permit Status: Fees due
Permit Description: 1 40YRD ROLL OFF TO BE DELIVERED ON 10/14 AND REMOVED ON 10/29 WILL BE PLACED IN FRONT OF HOUSE OFF STREET
Start Date Submittal Complete Date Status  
09/29/2026 RIGHT-OF-WAY REVIEW v.1 09/29/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0926-01056
Permit Status: Fees due
Permit Description: 1 40YRD ROLL OFF TO BE DELIVERED ON 10/14 AND REMOVED ON 10/29 WILL BE PLACED IN FRONT OF HOUSE OFF STREET
Total Outstanding Activity Conditions - 4
Date Name
09/29/2026 BARRICADES ARE REQUIRED AT ALL TIMES FOR ROLL OR PODS PLACED IN THE CITY R.O.W Roll-offs/dumpsters/pods 1. Roll-offs or Dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing storm drain infrastructure. 2. Roll-offs or Dumpsters shall keep lids on so that roll-off or dumpsters is kept covered when not in use. Plugs shall be kept in place. 3. Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4. Damaged containers shall be reported for replacement.
09/29/2026 Traffic control set-up approved between 9AM - 3:30PM
09/29/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/29/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.