Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Apply Date:
09/29/2026
Applicant:
ALICIA OROZCO
Description:
1- 40YRD ROLL OFF TO BE DELIVERED ON 10/09 AND REMOVED ON 10/12 WILL BE PLACED OFF SUNFILED CANYON

Permit Reviews

Permit Number - TR-ROW-0926-01055
Permit Status: Inspections
Permit Description: 1- 40YRD ROLL OFF TO BE DELIVERED ON 10/09 AND REMOVED ON 10/12 WILL BE PLACED OFF SUNFILED CANYON
Start Date Submittal Complete Date Status  
09/29/2026 RIGHT-OF-WAY REVIEW v.1 09/29/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0926-01055
Permit Status: Inspections
Permit Description: 1- 40YRD ROLL OFF TO BE DELIVERED ON 10/09 AND REMOVED ON 10/12 WILL BE PLACED OFF SUNFILED CANYON
Total Outstanding Activity Conditions - 3
Date Name
09/29/2026 BARRICADES ARE REQUIRED AT ALL TIMES FOR ROLL OR PODS PLACED IN THE CITY R.O.W Roll-offs/dumpsters/pods 1. Roll-offs or Dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing storm drain infrastructure. 2. Roll-offs or Dumpsters shall keep lids on so that roll-off or dumpsters is kept covered when not in use. Plugs shall be kept in place. 3. Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4. Damaged containers shall be reported for replacement.
09/29/2026 Traffic Control set-up approved between 7AM - 5PM
09/29/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0926-01055
Permite Description: 1- 40YRD ROLL OFF TO BE DELIVERED ON 10/09 AND REMOVED ON 10/12 WILL BE PLACED OFF SUNFILED CANYON
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
TRSP - ROW - Barricade - Setup/Routine N/A Scheduled
TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Scheduled
TRSP - ROW - Final N/A Scheduled

Scheduled Inspections

Scheduled Inspections - TR-ROW-0926-01055
Status: Inspections
Description: 1- 40YRD ROLL OFF TO BE DELIVERED ON 10/09 AND REMOVED ON 10/12 WILL BE PLACED OFF SUNFILED CANYON
Scheduled Date Description Entered By Entered Date
10/09/2026 TRSP - ROW - Barricade - Setup/Routine Scheduled
10/09/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Scheduled
10/13/2026 TRSP - ROW - Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW