Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW)
Address:
2650 N ORACLE RD
Address NEW:
2650 N ORACLE RD
Apply Date:
09/28/2026
Applicant:
Andrew Ruiz
Description:
Will be closing the north bound right lane on Oracle Rd at 2650 N Oracle Rd. For Trouble Shooting the AT&T Small Cell Site. No excavation. Work should only take 1 day. RCB*-*

Permit Reviews

Permit Number - TR-ROW-0926-01050
Permit Status: Issued
Permit Description: Will be closing the north bound right lane on Oracle Rd at 2650 N Oracle Rd. For Trouble Shooting the AT&T Small Cell Site. No excavation. Work should only take 1 day. RCB*-*
Start Date Submittal Complete Date Status  
10/25/2026 RIGHT-OF-WAY REVIEW v.2 10/28/2026 APPROVED Review Details
09/29/2026 RIGHT-OF-WAY REVIEW v.1 10/21/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0926-01050
Permit Status: Issued
Permit Description: Will be closing the north bound right lane on Oracle Rd at 2650 N Oracle Rd. For Trouble Shooting the AT&T Small Cell Site. No excavation. Work should only take 1 day. RCB*-*
Total Outstanding Activity Conditions - 8
Date Name
10/05/2026 Bike Lane Access and Accommodation
10/05/2026 Pre-Activity Meeting:
10/05/2026 Traffic Control set-up approved between 7AM - 5PM
10/26/2026 HOLIDAY RESTRICTION
10/27/2026 Oracle Rd is under holiday restriction from the week of Thanksgiving through January 2. No work requiring barricades in the ROW shall occur within the restricted limits during this period
10/28/2026 Continuous ADA-compliant pedestrian access shall be maintained at all times. If a sidewalk is closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices.
10/28/2026 Lane and street closures shall be permitted only during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four-hour lane closures are not permitted unless specifically approved by the City. Traffic control devices shall not be stored in a bike lane or sidewalk.
10/28/2026 The contractor shall always maintain safe and continuous access to all adjacent businesses during construction.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PEARCE SERVICES - 2650 N ORACLE RD - M073419345 - COMMENT RESPONSE LETTER - 10-23-26-2026-10-23_V1.PDF DOCUMENTS VIEW
PEARCE SERVICES - 2650 N ORACLE RD - M073419345 - NB RIGHT LANE - PLAN 1 -REV 1_V2.PDF DOCUMENTS VIEW
PEARCE SERVICES - 2650 N ORACLE RD - M073419345 - NB RIGHT LANE - SITE PLAN_V1.PDF DOCUMENTS VIEW