Permit: TR-ROW-0926-01049
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
3970 N FLOWING WELLS RD
Address NEW:
3970 N FLOWING WELLS RD
Apply Date:
09/28/2026
Applicant:
Andrew Ruiz
Description:
Will be closing northbound right lane on Flowing Well Rd. for repairing sidewalk in front of Circle K at 3970 N Flowing Well Rd. In response to violation of Tucson City Code Chapter 25 Section 25-12 Damaged Sidewalk Requiring Repair. RCB*-*
Permit Reviews
Permit Number - TR-ROW-0926-01049
Permit Status: Inspections
Permit Description: Will be closing northbound right lane on Flowing Well Rd. for repairing sidewalk in front of Circle K at 3970 N Flowing Well Rd. In response to violation of Tucson City Code Chapter 25 Section 25-12 Damaged Sidewalk Requiring Repair.
RCB*-*
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/29/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0926-01049
Permit Status: Inspections
Permit Description: Will be closing northbound right lane on Flowing Well Rd. for repairing sidewalk in front of Circle K at 3970 N Flowing Well Rd. In response to violation of Tucson City Code Chapter 25 Section 25-12 Damaged Sidewalk Requiring Repair.
RCB*-*
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 10/05/2026 | The following extended traffic control set-up times were approved: 24 HRS |
| 10/05/2026 | Bike Lane Access and Accommodation |
| 10/05/2026 | Bus Stop/Route: |
| 10/05/2026 | Pre-Activity Meeting: |
| 10/23/2026 | Driveway shall be brought up to City Code. Install PAG 206 driveway. |
| 10/23/2026 | New sidewalk panels shall be install per PAG 200 |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0926-01049
Permit Description: Will be closing northbound right lane on Flowing Well Rd. for repairing sidewalk in front of Circle K at 3970 N Flowing Well Rd. In response to violation of Tucson City Code Chapter 25 Section 25-12 Damaged Sidewalk Requiring Repair.
RCB*-*
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | No design changes at the moment they are currently doing a notice of violation or replacing two or three panel panels like for like it will be done in one day | |
| 10/29/2026 | Required: Start Work Notice - Notify your DTM Inspector of your work start date. Notification only; you will be contacted if a Pre-Activity Meeting is needed. | Passed | Not needed replacing like for like NOV | |
| 11/03/2026 | TRSP - ROW - Notice of Completion | Passed | All work completed four notice of violation sidewalk repair | |
| 10/29/2026 | Passed | Not needed replacing like for like NOV |