Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW)
Address:
986 S PANTANO RD
Address NEW:
986 S PANTANO RD
Apply Date:
09/24/2026
Applicant:
Brooke Bushman
Description:
Storm to Shade GSI Maintenance/ Fall season September 1 - November 30 2026 - Sediment removal in basin, invasive species removal, trash removal, vegetation care Fall Season Runs 9/1 - 11-30/2026 Only one hour required to clear scuppers in road per visit - visits will occur during one week period each month Use of Shadow Truck required. Rolling shadow Truck traffic control not to exceed 2 hours in a single location, with on site flaggers for right of way with less than 2 travel lanes in each direction. Closures that exceed 2 hours will require full traffic control setups based on road configuration.

Permit Reviews

Permit Number - TR-ROW-0926-01040
Permit Status: Issued
Permit Description: Storm to Shade GSI Maintenance/ Fall season September 1 - November 30 2026 - Sediment removal in basin, invasive species removal, trash removal, vegetation care Fall Season Runs 9/1 - 11-30/2026 Only one hour required to clear scuppers in road per visit - visits will occur during one week period each month Use of Shadow Truck required. Rolling shadow Truck traffic control not to exceed 2 hours in a single location, with on site flaggers for right of way with less than 2 travel lanes in each direction. Closures that exceed 2 hours will require full traffic control setups based on road configuration.
Start Date Submittal Complete Date Status  
09/25/2026 RIGHT-OF-WAY REVIEW v.1 09/25/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0926-01040
Permit Status: Issued
Permit Description: Storm to Shade GSI Maintenance/ Fall season September 1 - November 30 2026 - Sediment removal in basin, invasive species removal, trash removal, vegetation care Fall Season Runs 9/1 - 11-30/2026 Only one hour required to clear scuppers in road per visit - visits will occur during one week period each month Use of Shadow Truck required. Rolling shadow Truck traffic control not to exceed 2 hours in a single location, with on site flaggers for right of way with less than 2 travel lanes in each direction. Closures that exceed 2 hours will require full traffic control setups based on road configuration.
Total Outstanding Activity Conditions - 4
Date Name
09/25/2026 Bus Stop/Route
09/25/2026 Rolling Shadow Truck
09/25/2026 Traffic control set-up approved between 9AM - 3:30PM
09/25/2026 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from the week of Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
GSI PANTANO ASSETS_V1.PDF DOCUMENTS VIEW