Permit: TR-ROW-0926-01013
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW)
Address:
1159 N CRAYCROFT RD
Address NEW:
1159 N CRAYCROFT RD
Apply Date:
09/18/2026
Applicant:
Ali Fermawi
Description:
Contractor to perform work within the right-of-way, specifically focusing on the replacement of a water main and its connection to existing infrastructure. This project is anticipated to occur along major roadways and is therefore expected to cause substantial disruptions. This permit application serves as an extension for the work authorized under permit TR-ROW-0226-00243.
Permit Reviews
Permit Number - TR-ROW-0926-01013
Permit Status: Needs resubmittal
Permit Description: Contractor to perform work within the right-of-way, specifically focusing on the replacement of a water main and its connection to existing infrastructure. This project is anticipated to occur along major roadways and is therefore expected to cause substantial disruptions.
This permit application serves as an extension for the work authorized under permit TR-ROW-0226-00243.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/05/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0926-01013
Permit Status: Needs resubmittal
Permit Description: Contractor to perform work within the right-of-way, specifically focusing on the replacement of a water main and its connection to existing infrastructure. This project is anticipated to occur along major roadways and is therefore expected to cause substantial disruptions.
This permit application serves as an extension for the work authorized under permit TR-ROW-0226-00243.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 09/24/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/24/2026 | PAVEMENT MORATORIUM |
| 09/24/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 09/24/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/24/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |