Permit: TR-ROW-0926-01012
Permit Details
Apply Date:
09/18/2026
Applicant:
Description:
JO 326018 Site 1 - Remove Cleanout and install a new terminal manhole at CO 9907*07. Install Approximately 244 LF of 6" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. MH 8583-27 will get a bench rehab.
Permit Reviews
Permit Number - TR-ROW-0926-01012
Permit Status: Inspections
Permit Description: JO 326018 Site 1 - Remove Cleanout and install a new terminal manhole at CO 9907*07. Install Approximately 244 LF of 6" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. MH 8583-27 will get a bench rehab.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/05/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0926-01012
Permit Status: Inspections
Permit Description: JO 326018 Site 1 - Remove Cleanout and install a new terminal manhole at CO 9907*07. Install Approximately 244 LF of 6" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. MH 8583-27 will get a bench rehab.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 09/22/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/22/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 09/22/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 09/22/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |