Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Address:
1101 E 8TH ST
Address NEW:
1101 E 8TH ST
Apply Date:
09/16/2026
Applicant:
Description:
JO 326017 Site 1 - Remove and replace approximately 10LF of broken and fractured VCP pipe at 87' and 132' from the upstream manhole 8583-27. Install Approximately 250 LF of 8" Cured in Place Pipe between MH 8583-27 and MH 8583-27A. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. MH 8583-27 and 8583-27A will get a bench rehab.

Permit Reviews

Permit Number - TR-ROW-0926-01008
Permit Status: In review
Permit Description: JO 326017 Site 1 - Remove and replace approximately 10LF of broken and fractured VCP pipe at 87' and 132' from the upstream manhole 8583-27. Install Approximately 250 LF of 8" Cured in Place Pipe between MH 8583-27 and MH 8583-27A. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. MH 8583-27 and 8583-27A will get a bench rehab.
Start Date Submittal Complete Date Status  
09/16/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0926-01008
Permit Status: In review
Permit Description: JO 326017 Site 1 - Remove and replace approximately 10LF of broken and fractured VCP pipe at 87' and 132' from the upstream manhole 8583-27. Install Approximately 250 LF of 8" Cured in Place Pipe between MH 8583-27 and MH 8583-27A. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. MH 8583-27 and 8583-27A will get a bench rehab.
Total Outstanding Activity Conditions - 4
Date Name
09/21/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/21/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/21/2026 Traffic Control set-up approved between 7AM - 5PM
09/21/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.