Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Address NEW:
701 W CONGRESS ST
Apply Date:
09/10/2026
Applicant:
BRIAN MAJUTA JR - Quail Construction
Description:
Permit for moving our site fence to back of curb along Bonita. To allow for construction activities to safely take place on site without interference to the public. CONTINUATION OF PERMIT TR-ROW-0226-00195

Permit Reviews

Permit Number - TR-ROW-0926-00990
Permit Status: In review
Permit Description: Permit for moving our site fence to back of curb along Bonita. To allow for construction activities to safely take place on site without interference to the public. CONTINUATION OF PERMIT TR-ROW-0226-00195
Start Date Submittal Complete Date Status  
09/15/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0926-00990
Permit Status: In review
Permit Description: Permit for moving our site fence to back of curb along Bonita. To allow for construction activities to safely take place on site without interference to the public. CONTINUATION OF PERMIT TR-ROW-0226-00195
Total Outstanding Activity Conditions - 7
Date Name
09/17/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
09/17/2026 The following extended traffic control set-up times were approved: 24 hours
09/17/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
09/17/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/17/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/17/2026 Traffic control set-up approved between 9AM - 3:30PM
09/17/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.