Permit: TR-ROW-0926-00984
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
706 N SILVERBELL RD
Address NEW:
706 N SILVERBELL RD
Apply Date:
09/09/2026
Applicant:
Desert Barricade / Eric Horne
Description:
The contractor will be performing tree removal operations within the median along N. Silverbell Rd. To ensure public safety and facilitate work, the project includes the implementation of a southbound left-lane closure. Additionally, a shadow vehicle will be utilized during northbound traffic flow to provide necessary protection for the work crew. All work will adhere to standard safety protocols and traffic control requirements for the duration of the permit period.
Permit Reviews
Permit Number - TR-ROW-0926-00984
Permit Status: Inspections
Permit Description: The contractor will be performing tree removal operations within the median along N. Silverbell Rd. To ensure public safety and facilitate work, the project includes the implementation of a southbound left-lane closure. Additionally, a shadow vehicle will be utilized during northbound traffic flow to provide necessary protection for the work crew. All work will adhere to standard safety protocols and traffic control requirements for the duration of the permit period.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/11/2026 | RIGHT-OF-WAY REVIEW v.1 | 09/22/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0926-00984
Permit Status: Inspections
Permit Description: The contractor will be performing tree removal operations within the median along N. Silverbell Rd. To ensure public safety and facilitate work, the project includes the implementation of a southbound left-lane closure. Additionally, a shadow vehicle will be utilized during northbound traffic flow to provide necessary protection for the work crew. All work will adhere to standard safety protocols and traffic control requirements for the duration of the permit period.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 09/16/2026 | Bus Stop/Route |
| 09/16/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/16/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 09/16/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/16/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |