Permit: TR-ROW-0926-00968
Permit Details
Status:
In Review
Type:
Right-of-Way (ROW)
Address:
10891 E CHALKSTONE DR
Address NEW:
10891 E CHALKSTONE DR
Apply Date:
09/03/2026
Applicant:
Alton Gillespie
Description:
REPAIR SIDEWALK APPROX 4X14 (60 SQ FT)
Permit Reviews
Permit Number - TR-ROW-0926-00968
Permit Status: In review
Permit Description: REPAIR SIDEWALK APPROX 4X14 (60 SQ FT)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/21/2026 | RIGHT-OF-WAY REVIEW v.2 | 09/22/2026 | REQUIRES RESUBMIT |
| 09/03/2026 | RIGHT-OF-WAY REVIEW v.1 | 09/15/2026 | REQUIRES RESUBMIT |
| 09/25/2026 | RIGHT-OF-WAY REVIEW v.3 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-ROW-0926-00968
Permit Status: In review
Permit Description: REPAIR SIDEWALK APPROX 4X14 (60 SQ FT)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 09/14/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/14/2026 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. |
| 09/14/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 09/14/2026 | Traffic Control set-up approved between 7AM - 5PM |