Permit: TR-ROW-0925-01206
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
600 W CALLE SEVILLA
Address NEW:
600 W CALLE SEVILLA
Apply Date:
09/30/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Mission Manor neighborhood MAIN REPLACEMENT- the quarter section is delineated from W Calle Medina to Elvira Road, and S Santa Clara Avenue to S 12th Avenue. Latitude is 32.1288°, longitude is -110.9800°. Streets included in construction are W Calle Sevilla, W Calle Rita, W Calle Rita Ct, W Calle Aragon, W Calle Colado, S 14th Ave, W Elvira Rd, and Santa Clara Ave. 10/20/2025 - 6/30/2026, ~8 months Right of way will be impacted daily, but not in the same spot. Construction will finish each street entirely before moving on to the next street, starting with W Calle Rita, then W Calle Sevilla, then Elvira Rd, then Calle Colado and 14th Ave, then Calle Aragon. These streets will have rolling closures impacting only the segment we are working on. Closures will be ~300-500 LF. 1/27/26- 90 DAY RENEWAL AS OF 1/20/26 (REQUESTED UNDER TUCSON WATER). NEW EXPIRATION 4/20/26.
Permit Reviews
Permit Number - TR-ROW-0925-01206
Permit Status: Inspections
Permit Description: Mission Manor neighborhood MAIN REPLACEMENT- the quarter section is delineated from W Calle Medina to Elvira Road, and S Santa Clara Avenue to S 12th Avenue. Latitude is 32.1288°, longitude is -110.9800°. Streets included in construction are W Calle Sevilla, W Calle Rita, W Calle Rita Ct, W Calle Aragon, W Calle Colado, S 14th Ave, W Elvira Rd, and Santa Clara Ave.
10/20/2025 - 6/30/2026, ~8 months
Right of way will be impacted daily, but not in the same spot. Construction will finish each street entirely before moving on to the next street, starting with W Calle Rita, then W Calle Sevilla, then Elvira Rd, then Calle Colado and 14th Ave, then Calle Aragon. These streets will have rolling closures impacting only the segment we are working on. Closures will be ~300-500 LF.
1/27/26- 90 DAY RENEWAL AS OF 1/20/26 (REQUESTED UNDER TUCSON WATER). NEW EXPIRATION 4/20/26.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/16/2025 | RIGHT-OF-WAY REVIEW v.3 | 10/20/2025 | APPROVED |
| 10/14/2025 | RIGHT-OF-WAY REVIEW v.2 | 10/15/2025 | REQUIRES RESUBMIT |
| 10/01/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/06/2025 | REQUIRES RESUBMIT |
| 02/17/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | 03/02/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0925-01206
Permit Status: Inspections
Permit Description: Mission Manor neighborhood MAIN REPLACEMENT- the quarter section is delineated from W Calle Medina to Elvira Road, and S Santa Clara Avenue to S 12th Avenue. Latitude is 32.1288°, longitude is -110.9800°. Streets included in construction are W Calle Sevilla, W Calle Rita, W Calle Rita Ct, W Calle Aragon, W Calle Colado, S 14th Ave, W Elvira Rd, and Santa Clara Ave.
10/20/2025 - 6/30/2026, ~8 months
Right of way will be impacted daily, but not in the same spot. Construction will finish each street entirely before moving on to the next street, starting with W Calle Rita, then W Calle Sevilla, then Elvira Rd, then Calle Colado and 14th Ave, then Calle Aragon. These streets will have rolling closures impacting only the segment we are working on. Closures will be ~300-500 LF.
1/27/26- 90 DAY RENEWAL AS OF 1/20/26 (REQUESTED UNDER TUCSON WATER). NEW EXPIRATION 4/20/26.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/02/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 10/01/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 10/01/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0925-01206
Permite Description: Mission Manor neighborhood MAIN REPLACEMENT- the quarter section is delineated from W Calle Medina to Elvira Road, and S Santa Clara Avenue to S 12th Avenue. Latitude is 32.1288°, longitude is -110.9800°. Streets included in construction are W Calle Sevilla, W Calle Rita, W Calle Rita Ct, W Calle Aragon, W Calle Colado, S 14th Ave, W Elvira Rd, and Santa Clara Ave.
10/20/2025 - 6/30/2026, ~8 months
Right of way will be impacted daily, but not in the same spot. Construction will finish each street entirely before moving on to the next street, starting with W Calle Rita, then W Calle Sevilla, then Elvira Rd, then Calle Colado and 14th Ave, then Calle Aragon. These streets will have rolling closures impacting only the segment we are working on. Closures will be ~300-500 LF.
1/27/26- 90 DAY RENEWAL AS OF 1/20/26 (REQUESTED UNDER TUCSON WATER). NEW EXPIRATION 4/20/26.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2026 | TRSP - ROW - Final | N/A | Re-inspection required | |
| 03/18/2026 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required | |
| 03/18/2026 | TRSP - ROW - Bituminous Treatment | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0925-01206
Permit Description: Mission Manor neighborhood MAIN REPLACEMENT- the quarter section is delineated from W Calle Medina to Elvira Road, and S Santa Clara Avenue to S 12th Avenue. Latitude is 32.1288°, longitude is -110.9800°. Streets included in construction are W Calle Sevilla, W Calle Rita, W Calle Rita Ct, W Calle Aragon, W Calle Colado, S 14th Ave, W Elvira Rd, and Santa Clara Ave.
10/20/2025 - 6/30/2026, ~8 months
Right of way will be impacted daily, but not in the same spot. Construction will finish each street entirely before moving on to the next street, starting with W Calle Rita, then W Calle Sevilla, then Elvira Rd, then Calle Colado and 14th Ave, then Calle Aragon. These streets will have rolling closures impacting only the segment we are working on. Closures will be ~300-500 LF.
1/27/26- 90 DAY RENEWAL AS OF 1/20/26 (REQUESTED UNDER TUCSON WATER). NEW EXPIRATION 4/20/26.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/21/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 01/28/2026 | TRSP - ROW - Barricade Takedown | Passed | ||
| 01/29/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed |