Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0925-01202
Permit Details
Apply Date:
09/29/2025
Applicant:
ALICIA OROZCO
Description:
1-40 YRD TO BE DELIVERED ON 10/23 REMOVED ON 10/27 / OFF STREET
Permit Reviews
Permit Number - TR-ROW-0925-01202
Permit Status: Complete
Permit Description: 1-40 YRD TO BE DELIVERED ON 10/23 REMOVED ON 10/27 / OFF STREET
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/29/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/30/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0925-01202
Permit Status: Complete
Permit Description: 1-40 YRD TO BE DELIVERED ON 10/23 REMOVED ON 10/27 / OFF STREET
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/30/2025 | A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 09/30/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 09/30/2025 | BARRICADES ARE REQUIRED AT ALL TIMES FOR ROLL OR PODS PLACED IN THE CITY R.O.W Roll-offs/dumpsters/pods 1. Roll-offs or Dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing storm drain infrastructure. 2. Roll-offs or Dumpsters shall keep lids on so that roll-off or dumpsters is kept covered when not in use. Plugs shall be kept in place. 3. Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4. Damaged containers shall be reported for replacement. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0925-01202
Permit Description: 1-40 YRD TO BE DELIVERED ON 10/23 REMOVED ON 10/27 / OFF STREET
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/21/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 11/21/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/21/2025 | TRSP - ROW - Final | Passed |