Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2931 S PORTIA AV
Address NEW:
2931 S PORTIA AV
Apply Date:
09/29/2025
Applicant:
Bryan Vernon
Description:
I have several pieces of the sidewalk that must be replaced

Permit Reviews

Permit Number - TR-ROW-0925-01196
Permit Status: Complete
Permit Description: I have several pieces of the sidewalk that must be replaced
Start Date Submittal Complete Date Status  
09/29/2025 RIGHT-OF-WAY REVIEW v.1 09/30/2025 REQUIRES RESUBMIT Review Details
10/06/2025 RIGHT-OF-WAY REVIEW v.2 10/06/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0925-01196
Permit Status: Complete
Permit Description: I have several pieces of the sidewalk that must be replaced
Total Outstanding Activity Conditions - 3
Date Name
10/06/2025 Traffic Control set-up approved between 7AM - 5PM
10/06/2025 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
10/06/2025 SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0925-01196
Permit Description: I have several pieces of the sidewalk that must be replaced
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/22/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed I spoke with Brian over the phone, and after coming out to the site, I agreed to allow grinding with one panel to create a smooth transition and the other panels marked out for repair don’t appear to need repair.
11/04/2025 TRSP - ROW - Final Passed After a conversation with the property, owner and agreement was made to grind the sidewalk down rather than replace the panel
11/04/2025 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed Work is complete
11/04/2025 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed Work is complete