Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
812 E SPEEDWAY BL
Apply Date:
09/26/2025
Applicant:
Lisa Bowers
Description:
Lane closure/ barricade only for OVERNIGHT pour associated with Capstone project

Permit Reviews

Permit Number - TR-ROW-0925-01189
Permit Status: Complete
Permit Description: Lane closure/ barricade only for OVERNIGHT pour associated with Capstone project
Start Date Submittal Complete Date Status  
09/26/2025 RIGHT-OF-WAY REVIEW v.1 10/01/2025 APPROVED Review Details
10/15/2025 RIGHT-OF-WAY REVIEW REVISION v.1 10/16/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0925-01189
Permit Status: Complete
Permit Description: Lane closure/ barricade only for OVERNIGHT pour associated with Capstone project
Total Outstanding Activity Conditions - 5
Date Name
09/26/2025 The following extended traffic control set-up times were approved:
10/01/2025 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions
10/01/2025 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
10/01/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
10/01/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0925-01189
Permit Description: Lane closure/ barricade only for OVERNIGHT pour associated with Capstone project
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/14/2025 TRSP - ROW - Barricade - Setup/Routine Passed
11/14/2025 TRSP - ROW - Barricade Takedown Passed
11/14/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
CAPSTONE LANE CLOSURE- 10-9-2025_V1.PDF DOCUMENTS VIEW
CORE CONSTRUCTION - 812 E SPEEDWAY BLVD - NB EUCLID RIGHT LN CL PLAN 8 - CAPSTONE 24-10-011_V1.PDF DOCUMENTS VIEW
OCTOBER APPROVED - TEMPORARY NOISE EXEMPTION_V1.PDF DOCUMENTS VIEW