Permit: TR-ROW-0925-01187
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
6050 S MEADOW BREEZE DR
Address NEW:
6050 S MEADOW BREEZE DR
Apply Date:
09/25/2025
Applicant:
Daniel Ruiz
Description:
Demo damaged sidewalk and reinstall like for like
Permit Reviews
Permit Number - TR-ROW-0925-01187
Permit Status: Complete
Permit Description: Demo damaged sidewalk and reinstall like for like
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/26/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/26/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0925-01187
Permit Status: Complete
Permit Description: Demo damaged sidewalk and reinstall like for like
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 09/26/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 09/26/2025 | REPLACE/REPAIR APPROXIMATELY TWO (2) SIDEWALK PANELS PER PAG STANDARD DETAIL 200. |
| 09/26/2025 | Pre-activity meeting to be held 72 hours in advance of work start with inspections. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/26/2025 | IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR MIKE BRAVIN AT 520-403-1236 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0925-01187
Permit Description: Demo damaged sidewalk and reinstall like for like
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Site is ready for concrete | |
| 10/14/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with Danny over the phone. He will send me pictures of the compaction and the forms he is planning to pour at 7 AM on Wednesday, October 15. | |
| 10/16/2025 | TRSP - ROW - Final | Passed | Work is complete | |
| 10/16/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | Work is complete |