Permit: TR-ROW-0925-01182
Permit Details
Apply Date:
09/24/2025
Applicant:
BRIAN MAJUTA JR - Quail Construction
Description:
Air-Vacuum Excavation of 6 utility potholes within 10" cores for the design phase of Tucson Water 26th St: Sahuara Ave to Van Buren CIP No. PJW252 Project. TRAFFIC CONTROL 7AM-5PM
Permit Reviews
Permit Number - TR-ROW-0925-01182
Permit Status: Complete
Permit Description: Air-Vacuum Excavation of 6 utility potholes within 10" cores for the design phase of Tucson Water 26th St: Sahuara Ave to Van Buren CIP No. PJW252 Project. TRAFFIC CONTROL 7AM-5PM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/03/2025 | RIGHT-OF-WAY REVIEW v.2 | 10/07/2025 | APPROVED |
| 09/24/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/26/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0925-01182
Permit Status: Complete
Permit Description: Air-Vacuum Excavation of 6 utility potholes within 10" cores for the design phase of Tucson Water 26th St: Sahuara Ave to Van Buren CIP No. PJW252 Project. TRAFFIC CONTROL 7AM-5PM
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/25/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 09/25/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 10/07/2025 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0925-01182
Permit Description: Air-Vacuum Excavation of 6 utility potholes within 10" cores for the design phase of Tucson Water 26th St: Sahuara Ave to Van Buren CIP No. PJW252 Project. TRAFFIC CONTROL 7AM-5PM
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/06/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 11/06/2025 | TRSP - ROW - Final | Passed | Work is complete |