Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
7655 S KOLB RD
Address NEW:
7655 S KOLB RD
Apply Date:
09/22/2025
Applicant:
ANGEL MORALES
Description:
Install water line 120’L X 4’W X 60”D. 24hrs shoulder closure.*** Continuation Permit Number: TR-ROW-0425-00455 ***

Permit Reviews

Permit Number - TR-ROW-0925-01157
Permit Status: Complete
Permit Description: Install water line 120’L X 4’W X 60”D. 24hrs shoulder closure.*** Continuation Permit Number: TR-ROW-0425-00455 ***
Start Date Submittal Complete Date Status  
09/22/2025 RIGHT-OF-WAY REVIEW v.1 09/22/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0925-01157
Permit Status: Complete
Permit Description: Install water line 120’L X 4’W X 60”D. 24hrs shoulder closure.*** Continuation Permit Number: TR-ROW-0425-00455 ***
Total Outstanding Activity Conditions - 6
Date Name
09/22/2025 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
09/22/2025 Pre-Activity Meeting
09/22/2025 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.
09/22/2025 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
09/22/2025 Traffic control set-up approved between 9AM - 3:30PM
09/22/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0925-01157
Permit Description: Install water line 120’L X 4’W X 60”D. 24hrs shoulder closure.*** Continuation Permit Number: TR-ROW-0425-00455 ***
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/24/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete. This permit is an extension of
TR-ROW-0425-00455.
11/24/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work is complete. This permit is an extension of
TR-ROW-0425-00455.
11/24/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete. This permit is an extension of
TR-ROW-0425-00455.
11/24/2025 TRSP - ROW - Final Passed Work is complete. This permit is an extension of
TR-ROW-0425-00455.