Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
1910 N STONE AV
Address NEW:
1910 N STONE AV
Apply Date:
09/18/2025
Applicant:
Andrew Ruiz
Description:
Perform three (3) Pothole locations in Stone Ave. for Rick Engineering to submit a Master Water Plan for the Sugar Hill on Stone Project

Permit Reviews

Permit Number - TR-ROW-0925-01145
Permit Status: Inspections
Permit Description: Perform three (3) Pothole locations in Stone Ave. for Rick Engineering to submit a Master Water Plan for the Sugar Hill on Stone Project
Start Date Submittal Complete Date Status  
09/19/2025 RIGHT-OF-WAY REVIEW v.1 09/29/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0925-01145
Permit Status: Inspections
Permit Description: Perform three (3) Pothole locations in Stone Ave. for Rick Engineering to submit a Master Water Plan for the Sugar Hill on Stone Project
Total Outstanding Activity Conditions - 1
Date Name
09/22/2025 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0925-01145
Permite Description: Perform three (3) Pothole locations in Stone Ave. for Rick Engineering to submit a Master Water Plan for the Sugar Hill on Stone Project
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/03/2025 TRSP - ROW - Paving - Subgrade/removal/placement N/A Re-inspection required
11/03/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0925-01145
Permit Description: Perform three (3) Pothole locations in Stone Ave. for Rick Engineering to submit a Master Water Plan for the Sugar Hill on Stone Project
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/03/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/03/2025 TRSP - ROW - Barricade Takedown Passed