Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
933 N 6TH AV
Address NEW:
933 N 6TH AV
Apply Date:
09/17/2025
Applicant:
Daniel Ruiz
Description:
Repair Damaged sidewalk two panels on one address and one on the other. Replacing with like for like but at correct levels

Permit Reviews

Permit Number - TR-ROW-0925-01140
Permit Status: Complete
Permit Description: Repair Damaged sidewalk two panels on one address and one on the other. Replacing with like for like but at correct levels
Start Date Submittal Complete Date Status  
10/16/2025 RIGHT-OF-WAY REVIEW v.4 10/16/2025 APPROVED Review Details
10/08/2025 RIGHT-OF-WAY REVIEW v.3 10/13/2025 REQUIRES RESUBMIT Review Details
09/26/2025 RIGHT-OF-WAY REVIEW v.2 09/26/2025 REQUIRES RESUBMIT Review Details
09/18/2025 RIGHT-OF-WAY REVIEW v.1 09/19/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0925-01140
Permit Status: Complete
Permit Description: Repair Damaged sidewalk two panels on one address and one on the other. Replacing with like for like but at correct levels
Total Outstanding Activity Conditions - 3
Date Name
09/19/2025 A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
09/19/2025 Traffic control set-up approved between 9AM - 3:30PM
09/19/2025 SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0925-01140
Permit Description: Repair Damaged sidewalk two panels on one address and one on the other. Replacing with like for like but at correct levels
Total Completed Inspections - 5
Date Description Inspector Results Comments
10/24/2025 TRSP - ROW - Barricade - Setup/Routine Passed
10/24/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/29/2025 TRSP - ROW - Final Passed
10/24/2025 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed
10/24/2025 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
DB 71583 - 935 N 6TH AVE - ENCANTO CONCRETE - APPROVED.PDF DOCUMENTS VIEW
6 AVE PDF_V1.PDF DOCUMENTS VIEW