Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0925-01140
Permit Details
Apply Date:
09/17/2025
Applicant:
Daniel Ruiz
Description:
Repair Damaged sidewalk two panels on one address and one on the other. Replacing with like for like but at correct levels
Permit Reviews
Permit Number - TR-ROW-0925-01140
Permit Status: Complete
Permit Description: Repair Damaged sidewalk two panels on one address and one on the other. Replacing with like for like but at correct levels
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/16/2025 | RIGHT-OF-WAY REVIEW v.4 | 10/16/2025 | APPROVED |
| 10/08/2025 | RIGHT-OF-WAY REVIEW v.3 | 10/13/2025 | REQUIRES RESUBMIT |
| 09/26/2025 | RIGHT-OF-WAY REVIEW v.2 | 09/26/2025 | REQUIRES RESUBMIT |
| 09/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/19/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0925-01140
Permit Status: Complete
Permit Description: Repair Damaged sidewalk two panels on one address and one on the other. Replacing with like for like but at correct levels
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/19/2025 | A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 09/19/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/19/2025 | SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0925-01140
Permit Description: Repair Damaged sidewalk two panels on one address and one on the other. Replacing with like for like but at correct levels
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/24/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/29/2025 | TRSP - ROW - Final | Passed | ||
| 10/24/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 10/24/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |