Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4410 S PARK AV
Address NEW:
4410 S PARK AV
Apply Date:
09/17/2025
Applicant:
Don Perkins
Description:
Construct new drive for project on to Fair Ave. Will need to demo existing sidewalk, pavement and curb for new drywall.

Permit Reviews

Permit Number - TR-ROW-0925-01137
Permit Status: Complete
Permit Description: Construct new drive for project on to Fair Ave. Will need to demo existing sidewalk, pavement and curb for new drywall.
Start Date Submittal Complete Date Status  
09/22/2025 RIGHT-OF-WAY REVIEW v.2 09/22/2025 APPROVED Review Details
09/17/2025 RIGHT-OF-WAY REVIEW v.1 09/22/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0925-01137
Permit Status: Complete
Permit Description: Construct new drive for project on to Fair Ave. Will need to demo existing sidewalk, pavement and curb for new drywall.
Total Outstanding Activity Conditions - 7
Date Name
09/18/2025 Traffic control set-up approved between 9AM - 3:30PM
09/18/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
09/22/2025 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions
09/22/2025 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
09/22/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/22/2025 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property
09/22/2025 Review/Field Comments:

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0925-01137
Permit Description: Construct new drive for project on to Fair Ave. Will need to demo existing sidewalk, pavement and curb for new drywall.
Total Completed Inspections - 5
Date Description Inspector Results Comments
10/02/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
10/07/2025 TRSP - ROW - Paving - Subgrade/removal/placement Passed
11/05/2025 TRSP - ROW - Final Passed
10/27/2025 TRSP - ROW - Barricade Takedown Passed
10/29/2025 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
CORE REVISED_V1.PDF DOCUMENTS VIEW
ROW AT FAIR - NEW DRIVE_V1.PDF DOCUMENTS VIEW