Permit: TR-ROW-0925-01136
Permit Details
Apply Date:
09/17/2025
Applicant:
ANGEL MORALES
Description:
Install 3 new ramps and 19.27 L’ of concrete headers and install 40’ of 6” vertical curb and repave entrance.*** Continuation Permit Number: TR-ROW-0725-00876
Permit Reviews
Permit Number - TR-ROW-0925-01136
Permit Status: Complete
Permit Description: Install 3 new ramps and 19.27 L’ of concrete headers and install 40’ of 6” vertical curb and repave entrance.***
Continuation Permit Number: TR-ROW-0725-00876
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/17/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/24/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0925-01136
Permit Status: Complete
Permit Description: Install 3 new ramps and 19.27 L’ of concrete headers and install 40’ of 6” vertical curb and repave entrance.***
Continuation Permit Number: TR-ROW-0725-00876
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 09/18/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 09/18/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/18/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/18/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0925-01136
Permit Description: Install 3 new ramps and 19.27 L’ of concrete headers and install 40’ of 6” vertical curb and repave entrance.***
Continuation Permit Number: TR-ROW-0725-00876
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/08/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 10/01/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/02/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 10/01/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 10/20/2025 | TRSP - ROW - Final | Passed |