Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
3050 E MILBER ST
Address NEW:
3050 E MILBER ST
Apply Date:
09/17/2025
Applicant:
Antonio Moreno
Description:
Potholing, replacement of Waterline

Permit Reviews

Permit Number - TR-ROW-0925-01135
Permit Status: Inspections
Permit Description: Potholing, replacement of Waterline
Start Date Submittal Complete Date Status  
09/17/2025 RIGHT-OF-WAY REVIEW v.1 09/17/2025 REQUIRES RESUBMIT Review Details
09/18/2025 RIGHT-OF-WAY REVIEW v.2 09/19/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0925-01135
Permit Status: Inspections
Permit Description: Potholing, replacement of Waterline
Total Outstanding Activity Conditions - 6
Date Name
09/18/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
09/18/2025 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions
09/18/2025 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way.
09/18/2025 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual
09/18/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/18/2025 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0925-01135
Permite Description: Potholing, replacement of Waterline
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/20/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0925-01135
Permit Description: Potholing, replacement of Waterline
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/02/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/20/2025 TRSP - ROW - Barricade - Setup/Routine Passed
11/20/2025 TRSP - ROW - Backfill - Placement/Compaction Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
COUNTRY CLUB -5-MODEL MILBUR_V1.PDF DOCUMENTS VIEW
COUNTRY CLUB-1-MODEL MILBUR_V1.PDF DOCUMENTS VIEW
COUNTRY CLUB-2-MODEL MILBUR_V1.PDF DOCUMENTS VIEW
COUNTRY CLUB-4-MODEL MILBUR_V1.PDF DOCUMENTS VIEW
PIMA COUNTY OME R5_POTHOLE EXHIBIT_V1.PDF DOCUMENTS VIEW