Permit: TR-ROW-0925-01131
Permit Details
Apply Date:
09/15/2025
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
Sewer Tie
Permit Reviews
Permit Number - TR-ROW-0925-01131
Permit Status: Complete
Permit Description: Sewer Tie
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/15/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/16/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0925-01131
Permit Status: Complete
Permit Description: Sewer Tie
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/16/2025 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 09/16/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 09/16/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0925-01131
Permit Description: Sewer Tie
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/24/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/24/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 03/06/2026 | TRSP - ROW - Final | Passed | Standard tea top all work complete for the permanent patch and barricades all have been removed |