Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
6015 S ANTRIM LP
Address NEW:
6015 S ANTRIM LP
Apply Date:
09/11/2025
Applicant:
Andrew Ruiz
Description:
Convert overhead electrical to underground on Columbus Blvd and Tappen Dr, total excavation 90’ **24hrs**

Permit Reviews

Permit Number - TR-ROW-0925-01115
Permit Status: Complete
Permit Description: Convert overhead electrical to underground on Columbus Blvd and Tappen Dr, total excavation 90’ **24hrs**
Start Date Submittal Complete Date Status  
09/29/2025 RIGHT-OF-WAY REVIEW v.2 10/01/2025 APPROVED Review Details
09/12/2025 RIGHT-OF-WAY REVIEW v.1 09/16/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0925-01115
Permit Status: Complete
Permit Description: Convert overhead electrical to underground on Columbus Blvd and Tappen Dr, total excavation 90’ **24hrs**
Total Outstanding Activity Conditions - 2
Date Name
09/16/2025 PRE-CON/PAVEMENT/SIDEWALK
09/16/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0925-01115
Permit Description: Convert overhead electrical to underground on Columbus Blvd and Tappen Dr, total excavation 90’ **24hrs**
Total Completed Inspections - 11
Date Description Inspector Results Comments
10/13/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/12/2025 TRSP - ROW - AERIAL INSTALLATION Passed No aerial work for this permit
11/12/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
11/12/2025 TRSP - ROW - Barricade - Setup/Routine Passed Already passed by Tristan
11/12/2025 TRSP - ROW - Bituminous Treatment Passed Work is complete
11/12/2025 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed Work is complete
11/12/2025 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed Work is complete
11/12/2025 TRSP - ROW - Drainage - Pipe Installation/Removal Passed Work is complete but no drainage inspection was requested
11/12/2025 TRSP - ROW - Field Change Request Passed This inspection was not needed
11/14/2025 TRSP - ROW - Final Passed Work is complete
11/14/2025 TRSP - ROW - Barricade Takedown Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
6154 S COLUMBUS BLVD SITE COT RV_V1.PDF DOCUMENTS VIEW
6154 S COLUMBUS BLVD SITE1-COT_V1.PDF DOCUMENTS VIEW
6154 S COLUMBUS BLVD TCP1-RV_V2.PDF DOCUMENTS VIEW