Permit: TR-ROW-0925-01114
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4761 E LOS REALES RD
Address NEW:
4761 E LOS REALES RD
Apply Date:
09/10/2025
Applicant:
Andrew Ruiz
Description:
*Continuation of permits TR-ROW-0125-00034 & TR-ROW-0725-00916* Got approval project will start on Oct 6 Tying New Site Into Main Drive
Permit Reviews
Permit Number - TR-ROW-0925-01114
Permit Status: Complete
Permit Description: *Continuation of permits
TR-ROW-0125-00034 & TR-ROW-0725-00916*
Got approval project will start on Oct 6
Tying New Site Into Main Drive
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/10/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/12/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0925-01114
Permit Status: Complete
Permit Description: *Continuation of permits
TR-ROW-0125-00034 & TR-ROW-0725-00916*
Got approval project will start on Oct 6
Tying New Site Into Main Drive
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 09/12/2025 | The following extended traffic control set-up times were approved: |
| 09/12/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 09/12/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/12/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 09/12/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0925-01114
Permit Description: *Continuation of permits
TR-ROW-0125-00034 & TR-ROW-0725-00916*
Got approval project will start on Oct 6
Tying New Site Into Main Drive
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Spoke with Cody over the phone. He informed me that work will begin ASAP instead of the October 6 which states on the permit. | |
| 11/05/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Permit is expired. Work was never completed. Only a temporary paved entryway was constructed. There is currently no traffic control. | |
| 11/05/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | This permit is now expired. Work was never completed. Only a temporary paved entryway on the north side of the property was ever constructed. | |
| 10/13/2026 | TRSP - ROW - Final | Passed | Work is complete, permit is long expired |