Permit: TR-ROW-0925-01102
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2522 S JEFFERSON AV
Address NEW:
2522 S JEFFERSON AV
Apply Date:
09/08/2025
Applicant:
Dan Padilla
Description:
AIR VACUUM EXCAVATION OF 13 UTILITY POTHOLES FOR THE DESIGN PHASE OF TUCSON WATER MARYVALE MANOR MAIN REPLACEMENT PHASE 6 PROJECT CIP NO. PJW971/MVPH6. LOCATIONS ON PAVEMENT TO BE WITHIN 10" CORES AND APPROXIMATE SIZE OF OFF ROAD LOCATIONS IS 12" DIAMETER. The Potholing is being done on 35th St and 36th St between Jefferson Ave and Sahuara Ave.
Permit Reviews
Permit Number - TR-ROW-0925-01102
Permit Status: Complete
Permit Description: AIR VACUUM EXCAVATION OF 13 UTILITY POTHOLES FOR THE DESIGN PHASE OF TUCSON WATER MARYVALE MANOR MAIN REPLACEMENT PHASE 6 PROJECT CIP NO. PJW971/MVPH6. LOCATIONS ON PAVEMENT TO BE WITHIN 10" CORES AND APPROXIMATE SIZE OF OFF ROAD LOCATIONS IS 12" DIAMETER. The Potholing is being done on 35th St and 36th St between Jefferson Ave and Sahuara Ave.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/09/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/10/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0925-01102
Permit Status: Complete
Permit Description: AIR VACUUM EXCAVATION OF 13 UTILITY POTHOLES FOR THE DESIGN PHASE OF TUCSON WATER MARYVALE MANOR MAIN REPLACEMENT PHASE 6 PROJECT CIP NO. PJW971/MVPH6. LOCATIONS ON PAVEMENT TO BE WITHIN 10" CORES AND APPROXIMATE SIZE OF OFF ROAD LOCATIONS IS 12" DIAMETER. The Potholing is being done on 35th St and 36th St between Jefferson Ave and Sahuara Ave.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 09/10/2025 | PRE-CON/PAVEMENT |
| 09/10/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0925-01102
Permit Description: AIR VACUUM EXCAVATION OF 13 UTILITY POTHOLES FOR THE DESIGN PHASE OF TUCSON WATER MARYVALE MANOR MAIN REPLACEMENT PHASE 6 PROJECT CIP NO. PJW971/MVPH6. LOCATIONS ON PAVEMENT TO BE WITHIN 10" CORES AND APPROXIMATE SIZE OF OFF ROAD LOCATIONS IS 12" DIAMETER. The Potholing is being done on 35th St and 36th St between Jefferson Ave and Sahuara Ave.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Spoke with Dan over the phone and he confirmed work will begin on Monday the 15th and should take 2 to 3 days to complete. | |
| 10/17/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete | |
| 10/17/2025 | TRSP - ROW - Barricade Takedown | Passed | Work is complete | |
| 10/17/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 10/17/2025 | TRSP - ROW - Final | Passed | All potholes are sawcut with the plug replaced afterwards and a sealant used. |