Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0925-01097
Permit Details
Apply Date:
09/08/2025
Applicant:
Fernando Hinojosa
Description:
side walk lifted and creating a hazardous condition for pedestrians
Permit Reviews
Permit Number - TR-ROW-0925-01097
Permit Status: Complete
Permit Description: side walk lifted and creating a hazardous condition for pedestrians
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/28/2025 | RIGHT-OF-WAY REVIEW v.4 | 10/28/2025 | APPROVED |
| 09/08/2025 | RIGHT-OF-WAY REVIEW v.1 | 09/09/2025 | REQUIRES RESUBMIT |
| 10/22/2025 | RIGHT-OF-WAY REVIEW v.3 | 10/23/2025 | REQUIRES RESUBMIT |
| 09/12/2025 | RIGHT-OF-WAY REVIEW v.2 | 10/20/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0925-01097
Permit Status: Complete
Permit Description: side walk lifted and creating a hazardous condition for pedestrians
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 09/09/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 09/09/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/09/2025 | SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |
| 10/28/2025 | The following extended traffic control set-up times were approved: 24 hr. ADA pedestrian detour |
| 10/28/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 10/28/2025 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0925-01097
Permit Description: side walk lifted and creating a hazardous condition for pedestrians
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/18/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 11/19/2025 | TRSP - ROW - Final | Passed |